By allowing ads to appear on this site, you support the local businesses who, in turn, support great journalism.
Roadwork may cause delays
Placeholder Image

WHEN: 7:30 a.m. to 4 p.m., Monday, April 2, continuing through Thursday, April 5, weather permitting

WHERE: State Route 142, mile marker 12-13; reclaiming right of way

State Route 11, mile marker 11-13; reclaiming right of way

State Route 20, mile marker 0-3; reclaiming right of way

State Route 12, mile marker 4.69-16-55; roadway edge repair

WHAT: GA DOT maintenance crews have scheduled shoulder work to reclaim right of way on State Route 142, State Route 11 and State Route 20 and roadway edge repair on State Route 12 in Newton County. This work is tentatively scheduled daily between 7:30 a.m. and 4 p.m., weather permitting.

A single lane closure and/or flagman may be in utilized for this work. Motorists should reduce their speed in these and all work zones.

Each day, hundreds of Georgia Department of Transportation employees and contractors work on dozens of highway, bridge and intersection improvements throughout the state. Their work often brings them and heavy machinery in close proximity to travel lanes. Fifty-seven Georgia DOT personnel and many more motorists, passengers and contractors' workers have been killed in highway work zone accidents since 1973. Please help us prevent these tragedies by slowing down; being especially attentive and cautious as you pass through construction work zones; and always driving responsibly. Safer Driving; Safer Work Zones; For Everyone. For information on the Department of Transportation, visit (www.dot.ga.gov); you also may follow Georgia DOT on Facebook (http://www.facebook.com/GeorgiaDOT.
WHEN:7:30 a.m. to 4 p.m., Monday, April 2, continuing through Thursday, April 5, weather permitting

WHERE:State Route 142, mile marker 12-13; reclaiming right of way

State Route 11, mile marker 11-13; reclaiming right of way

State Route 20, mile marker 0-3; reclaiming right of way

State Route 12, mile marker 4.69-16-55; roadway edge repair

WHAT:GA DOT maintenance crews have scheduled shoulder work to reclaim right of way on State Route 142, State Route 11 and State Route 20 and roadway edge repair on State Route 12 in Newton County. This work is tentatively scheduled daily between 7:30 a.m. and 4 p.m., weather permitting.

A single lane closure and/or flagman may be in utilized for this work. Motorists should reduce their speed in these and all work zones.

Each day, hundreds of Georgia Department of Transportation employees and contractors work on dozens of highway, bridge and intersection improvements throughout the state. Their work often brings them and heavy machinery in close proximity to travel lanes. Fifty-seven Georgia DOT personnel and many more motorists, passengers and contractors' workers have been killed in highway work zone accidents since 1973. Please help us prevent these tragedies by slowing down; being especially attentive and cautious as you pass through construction work zones; and always driving responsibly. Safer Driving; Safer Work Zones; For Everyone. For information on the Department of Transportation, visit (www.dot.ga.gov); you also may follow Georgia DOT on Facebook (http://www.facebook.com/GeorgiaDOT.