The on- and off-ramp at Exit 90 on Interstate-20, along with the westbound inside and middle lanes from mile 90-91, will be closed from 9 p.m. Friday, Aug. 21 through 5 a.m. Monday, Aug. 24.
Olympus Painting Contractors are scheduled to continue bridge joint repair and replacement on the I-20 bridge over the railroad and Old Atlanta Highway.
According to the Georgia Department of Transportation, the upcoming work will not require a detour.
This $3.3 million dollar maintenance job on the two interstate bridges crossing SR 12 and the Old Atlanta Highway includes reconstruction of new joint headers in the bridge deck; edge beam and end wall reconstruction; installation of bridge joints; spall repairs of the substructure; epoxy injection into substructure cracks; cap strengthening; repaired slope paving and painting of the existing steel substructure.