Resurfacing of the Covington square will take place from 9 p.m. Aug. 8 through the afternoon of Aug. 9, weather permitting.
The Covington square closure, originally planned for Aug. 1 had to be rescheduled due to rain.
This closure is part of the milling and resurfacing project
on State Route 36 and will require the Covington square closure to through traffic. A signed detour will be in place.
Motorists are advised to use extreme caution at these locations.