Covington-Bridge Reconstruction Requires Weekend Closures at I-20 Exit 90
A reconstruction project for the westbound I-20 bridge at exit 90 begins this weekend, causing the closure of two lanes westbound from mile 91 to mile 90, along with the westbound on and off ramps.
Olympus Painting Contractors will start bridge joint with a work timeframe running from 9 p.m. Friday, June 12 until 5 a.m. Monday, June 15.
This $3.3 million dollar maintenance job on the two interstate bridges crossing SR 12 and the Old Atlanta Highway includes reconstruction of new joint headers in the bridge deck; edge beam and end wall reconstruction; installation of bridge joints; spall repairs of the substructure; epoxy injection into substructure cracks; cap strengthening; repaired slope paving and painting of the existing steel substructure.